Scheduled outage of a Pratt and Whitney LM 2500 gas turbine and at the same time the scheduled outage of the steam turbine valves and generator. All work. was done at the same time in very tight quarters.

We supported GE field service techs a on the engine outage. The engine was removed and sent out for bench maintenance then returned and rigged into the package.

This was done over a 12 day round the clock period and at the same time the scheduled outage of the steam turbine valves and generator. All done at the same time in very tight quarters. We used a Tadano 15 ton crane tucked in to the steam turbine to support the rigging by GE field service techs.